The Work generally consists of the replacement of select large water meters (2″ and larger) at locations throughout the City’s Water District with City furnished Compound Meter, including, but not limited to: Removal of existing meter assemblies and appurtenances; installing City supplied compound meter assemblies with full-size bypass, inlet strainer, test ports, OS&Y isolation valves, and AMI endpoint mounting; Where indicated, installation of above-ground insulated enclosures (“hot boxes”) on concrete pads; Service tap adjustments or new taps as shown; fittings and connections required to tie-in; Commissioning and data capture, GPS coordinate collection, and pre/post photo logs; Traffic control, erosion control, surface restoration, and disposal of removed materials; All incidental items necessary for a complete and functional installation per City of Aiken Specifications.