The South Broadway Sewer Improvements Project consists of installing approximately 1,150 linear feet of 10-inch and 900 linear feet of 8-inch diameter underground sanitary sewer pipeline starting near the intersection of South Broadway Street and West Walker Street and ending near the intersection of South Broadway Street and Minor Street. Four 8-inch diameter underground sanitary sewer pipelines will be installed from the mainline in South Broadway Street to service the residential and commercial units. Two 8-inch diameter underground sanitary sewer pipelines will be installed and stubbed to adjacent property owners for future connection. Approximately 2,200 linear feet of existing underground sanitary sewer pipeline will be abandoned in place due to the new improvements. As part of this project, South Broadway Street will be sawcut and replaced with new asphalt. It is the intent of these documents to describe the work required to complete this project in sufficient detail to secure comparable bids. All parts or work not specifically mentioned which are necessary in order to provide a complete installation shall be included in the bid and shall conform to all Local, State and Federal requirements.