Work performed under this transportation repair (TR) contract will consist of stormwater repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include sewer lateral replacement and water meter relocation or adjustment. Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties. The cost estimate for this project is listed as $804,377.07.