ROADWAY CONSTRUCTION SEQUENCE: (7-1-95) (Rev. 8-21-12) 560 SP1 R34R Pave each section of roadway begun in a continuous operation. Do not begin work on another section of roadway unless satisfactory progress is being made toward completion of intersections and all other required incidental work by satisfactorily furnishing additional paving equipment and personnel, except for milling and patching operations. BURNING RESTRICTIONS: (7-1-95) 200, 210, 215 SP2 R05 Open burning is not permitted on any portion of the right-of-way limits established for this project. Do not burn the clearing, grubbing or demolition debris designated for disposal and generated from the project at locations within the project limits, off the project limits or at any waste or borrow sites in this county. Dispose of the clearing, grubbing and demolition debris by means other than burning, according to state or local rules and regulations. DELETION OF FINAL SURFACE TESTING REQUIREMENTS: (1-20-26) 610 SP6 R45A Revise the Standard Specifications as follows: Pages 6-24 to 6-30, Article 610-13 FINAL SURFACE TESTING AND ACCEPTANCE, delete Article 610-13 in its entirety INCIDENTAL STONE BASE: (7-1-95)(Rev.1-16-24) 545 SP5 R28R Description Place incidental stone base on driveways, mailboxes, etc. immediately after paving and do not have the paving operations exceed stone base placement by more than one week without written permission of the Engineer.