Preconstruction Phase • Submit product data, shop drawings, installation procedures, and manufacturer certifications for review and approval. • Provide a mock-up panel for Owner/Architect approval before full installation proceeds. • Submit construction schedule, safety plan, and schedule of values. • All existing conditions must be verified during the bid process. Any discrepancies between drawings/specifications and actual field conditions shall be deemed verifiable conditions. No change orders will be accepted for conditions reasonably discoverable during pre-bid site investigation. Construction Phase / Site Protection • Prepare the existing stucco substrate in accordance with EIFS manufacturer requirements and project drawings, repairing cracks, spalls, or defects prior to application. • Install EIFS system with continuous insulation, base coat, reinforcing mesh, and finish coat, with proper detailing at windows, doors, joints, and transitions to prevent water intrusion. Finish shall be uniform in color and texture across the entire north facade. • Provide barriers, coverings, and signage to protect the Zen Garden and adjacent areas from dust, debris, and construction activities...