Contractor will remove by milling depth of 8 inches (Measured from original surface course) of existing asphalt and base material. After proof rolling to engineer's approval. Contractor will replace with 8" of Intermediate Type C asphalt in 2 lifts in accordance with the 2007 Standard Specifications for Highway Construction. Compensation for 8" Full Depth Patching includes all aspects of milling, hauling off of material, asphalt, asphalt placement and any other incidentals associated with this work. To fulfill the requirements of the pay item, work is to be performed in accordance with the plans. Specifications and terms of the contract. • 401.4.14 - Removal of Existing Asphalt Pavement before Patching • 401.4.15 - Conditioning of Subgrade • 401.4.16 - Surface Preparation and Leveling • 401.4.17 - Transportation and Delivery of Mixes • 401.4.18 - Application of Prime or Tack Coat • 401.4.19 - Spreading and Finishing • 401.4.20 - Compaction (Standard)