Item # 1: ( 909 - 30 ) Prefabricated Booth (6' x 8') - Furnish & Install Furnish, deliver, and install one (1) prefabricated booth measuring approximately 6 feet by 8 feet, including one (1) entry door, one (1) sliding service window, and one (1) factory-installed 10,000 BTU heating and cooling system. Booth must be certified by a Pennsylvania third-party inspection agency acceptable to Philadelphia L&I. Include all labor, materials, equipment, placement, anchoring, and final setup. NIGP Code: 909-30 Building Construction (Not Otherwise Classified) Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 909 - 30 ) Concrete Sidewalk Removal and Replacement (Approx. 6'-10' Section) Remove and replace approximately 6 feet 10 inches of existing uneven concrete sidewalk to provide a level, stable, and code-compliant base for booth installation. Include demolition, disposal, forming, pouring, finishing, curing, and restoration. NIGP Code: 909-30 Building Construction (Not Otherwise Classified) Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 LO - Lot Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 909 - 30 ) Electrical Service Installation (Approx. 100 LF Total, Including 20 LF Trenching) Provide and install complete electrical service from the main electrical panel to the booth, approximately 100 linear feet total, including approximately 20 linear feet of underground trenching, conduit, wiring, connections, and all accessories required for a complete and operational installation. NIGP Code: 909-30 Building Construction (Not Otherwise Classified) Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 LO - Lot Manufacturer: Brand: Model: Make: Packaging: Item # 4: ( 909 - 30 ) Permits, Drawings, and Inspections (Philadelphia L&I) Provide all required construction documents, shop drawings, permit applications, inspections, approvals, and pay all associated fees required by Philadelphia L&I and any other authority having jurisdiction. NIGP Code: 909-30 Building Construction (Not Otherwise Classified) Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 LO - Lot