The City of Sedro-Woolley is soliciting bids through the small works roster process for the restoration/repairs of chain link fencing at two city properties that experienced extensive flood damage during the Skagit River flood events of December 2025. The selected contractor shall provide labor, equipment and materials to perform the work as described below: The two properties that are affected are: 1. Riverfront Park, 1001 River Rd, Sedro-Woolley, WA; 2. Sedro-Woolley Live Fire Training Site, 1950 S Third Street, Sedro-Woolley, WA; Schedule A: There is approximately 1,340 LF of fencing of various sizes that were damaged by the flood waters at the two sites. The city desires to establish a per foot price for the contractor to supply and install fencing to their pre-flood condition. Fencing shall consist of a minimum schedule 20-pipe and 11-gauge galvanized fence fabric. Per foot or per lump sum price shall include all labor, equipment, and material necessary to complete the work. Quantity of fencing is an estimate. Actual linear footage of fencing to be repaired, may be more or less LF depending on how much of the fencing is salvageable. Estimated Quantities: QTY; 4’ Fencing 550 LF; 5’ Fencing 260 LF; 6’ Fencing 125 LF; 6’ Fencing 405 LF; with brown privacy slats; Schedule B: Miscellaneous Chain Link Fencing Repairs consists of hourly rates for a typical crew and equipment to perform miscellaneous chain link fencing repairs on an hourly basis related to the project area identified above.