1 800 Mobilization 1 LS 2 225 Unclassified Excavation 25 CY 3 230 Borrow Excavation 25 CY 4 402 Removal of Existing Structure on Emmett Rd 1 LS 5 SP Asbestos Assessment 1 EA 6 410 Foundation Excavation (Bridge) 40 CY 7 412 Unclassified Structure Excavation at Site (088-01-dfb75) 1 LS 8 420 Class A Concrete (Bridge) 13.6 CY 9 425 Reinforcing Steel (Bridge) 2,214 LB 10 440 Approximately _____LBS of Structural Steel 10,020 LB 11 450 Pile Excavation In Soil 24 LF 12 450 Pile Excavation Not In Soil 42 LF 13 450 Pile Driving Equipment Setup for (HP12x53) Steel Piles 6 EA 14 450 HP 12x53 Steel Piles 66 LF 15 430 Elastomeric Bearing – Type II 1 LS 16 SP Bridge Approach Fill Site (088-01-dfb75) 1 LS 17 SP Rip Rap Class II (4’-0” Thick) 90 TON 18 SP Timber Bridge Decking 388 LF 19 505 Shallow Undercut 10 CY 20 540 Aggregate Base Course 50 TON 21 545 Incidental Stone Base 50 TON 22 1605 Temporary Silt Fence 100 LF 23 SP Safety Fence 100 LF 24 1610 Stone for Erosion Control, Class B 20 TON 25 1610 Sediment Control Stone 20 TON