The overall project objective is to abate and demolish the Former Peck Elementary School. 1. Demolish all above and below ground structures, surfaces, USTs, and utilities in accordance with all laws and regulations pertaining to all such demolition activities. 2. Obtain all permits and reviews that may be required of all AHJ, including but not limited to COG, NCDPI, NCDEQ, NCHHCU, etc. 3. Asbestos abatement, grading, and erosion control design by accredited professional(s) 4. Upon completion, all excavations shall be filled in and the surface fine graded smooth and even, stabilized with seed and mulch including any additional plantings as may be required by AHJ. 5. Ensure all required record keeping of abatement activities including but not limited to chain of custody documentation of all regulated hazardous materials are retained and submitted to appropriate AHJ. 6. Work to minimize any scheduling, budgeting, and operational impacts to the Owner through close coordination and timely communication with the Owner, subcontractors, consultants, vendors, and its customers. 7. Design the process based on current GCS Design Guidelines and close GCS involvement through the various stages of design regarding building specifications and operational requirements. 8. Provide up-to-date documentation on any requested and agreed upon program requirements from GCS 9. Endeavor to ensure no changes are made during construction. 10. Endeavor to complete the project on time and within the GCS’s budget and optimize lifecycle costs with initialcapital costs. a. Provide a project that reliably meets or exceeds all regulatory and permitting requirements