Option 1:Through this Request for Proposal, the Authority seeks to engage a contractor who would be able to provide labor and equipment for movement of 8,000 cubic yards of sand from a designated catchment area on the shoreline to the west to the east side of the Marina Basin, and redeposited to a designated distribution area on the shoreline to the east of the Marina Basin, in compliance with an active permit issued by the U.S. Army Corps of Engineers. Respondents shall also provide a cost-per-cubic-yard rate for the movement of sand, should the Authority choose to move more (or less) than the 8,000 cubic yards identified in this RFP. Option 2:Through this Request for Proposal, the Authority seeks to engage contractors who would be able to provide labor or qualified operators of heavy equipment to be leased by the Authority in the movement of 8,000 cubic yards of sand from a designated catchment area on the shoreline to the west to the east side of the Marina Basin, and redeposited to a designated distribution area on the shoreline to the east of the Marina Basin, in compliance with an active permit issued by the U.S. Army Corps of Engineers. Respondents shall provide a cost-per-hour rate for qualified operators of heavy equipment, as well as the term and hours of availability for those operators. Any labor rates quoted shall be offered on an open-ended basis for the term cited, should the Authority choose to move more (or less) than the 8,000 cubic yards identified in this RFP.