The City of Florissant is soliciting sealed bids from qualified, professional contractors to furnish all labor, materials, equipment, and supervision necessary to remove and replace the existing pool deck tile surrounding the indoor pool at the James J. Eagan Center. All work shall be performed during the facility’s annual pool shutdown period and must be fully completed in August 2026, in coordination with City staff to minimize disruption and ensure timely reopening of the facility in September 2026. The project includes, but is not limited to, demolition and disposal of existing tile, surface preparation, installation of new pool deck tile and associated materials, and restoration of adjacent areas affected by the work. All work shall comply with applicable local, state, and federal codes, industry standards, and manufacturer recommendations, and shall be completed in a safe and workmanlike manner. A detailed scope of work is provided below. Deck Tile Demo & Install: Demo Existing Deck Tile Demo Existing Mosiac Base Perform Minor Tile Repairs @ Rollout Gutter Supply & Install Daltile Keystones Mosaic Tile @ Deck, color: TBD Supply & Install Daltile Keystones Mosaic MB5 Build Up Cove Base, color: TBD Supply & Install Daltile Keystones Mosaic Trim S812, color: TBD Supply & Install Horizontal Depth Markers & Signage Supply & Install Laticrete 254 Platinum as Bond Coat & Thin Set Supply & Install Laticrete 3701 Pre Mix Mud Bed for Minor Prep Supply & Install Laticrete Spectralock Epoxy Grout, color: TBD Supply & Install Laticrete Latasil Silicone Caulk, color: TBD Supply & Install Laticrete 9118 Primer Supply & Install Laticrete Hydroban as Crack Suppression @ Saw Joints Demo Machine Rental Grinder Rental Supply Dumpster All work figured for normal daytime hours. 7am-5pm...