The work will consist of the construction of roadway on new alignment from Six Mile Road (S-10-921) at Sweetgrass Basket Parkway to Hamlin Road (S-10-504) at Billy Swails Boulevard in Mount Pleasant as shown on the Plans. Construction activities include, but are not limited to clearing and grubbing, grading, stormwater drainage, asphalt paving, sidewalk construction, new traffic signals, street lighting and landscaping. Also included in the work is utility relocations (water lines and sanitary sewer force main), traffic control, erosion control and pavement markings. The total length of the project is 1.412 miles of new alignment roadway. Construction time for the project shall be five hundred forty-five (545) calendar days from the commencement date in the Notice to Proceed. All correspondence must be made through the Vendor Portal.