This Contract is for the Installation of New Communications Tower & Shed at Fire Station 21. In general, the Work includes: furnishing all labor, materials, equipment, supervision, and incidentals required for the installation of a new approximately 60-foot Owner-furnished communications tower at Fire Station 21. Work includes foundations, anchor bolts, structural steel erection, grounding, and all associated components as shown on the approved plans. The Work further includes installation of an Owner-furnished prefabricated Thermo Bond radio equipment building. The Work includes concrete foundation, slab, entry landing, bollards, and all required structural, architectural, and electrical components necessary for a complete and operational installation. Specifically excluded from the Work is final installation and activation of radio equipment, antennas, mounts, dishes, connectors, and other post-tower or post-building outfitting activities, which will be completed by others under separate contract(s), unless otherwise noted in the Contract Documents. Contractor shall perform all trenching, backfill, compaction, and restoration required for new underground electrical, telecom, and coaxial conduits, including extending conduits into the existing building and completing final connections to electrical and telecommunications systems, and providing stub-outs and terminations for Owner-furnished radio equipment, as shown on the approved plans. The Work also includes installation of a new exterior cable bridge, dry well, grounding and bonding systems, and repair or replacement of all existing concrete, paving, and site improvements disturbed by construction, restoring surfaces to equal or better condition.