004E0030 Maintenance of Traffic Diversion(s) Lump Sum LS 004E0050 Remove Traffic Diversion(s) Lump Sum LS 009E0010 Mobilization Lump Sum LS 009E3230 Grade Staking 0.454 Mile 009E3250 Miscellaneous Staking 0.454 Mile 009E3280 Slope Staking 0.454 Mile 009E3290 Structure Staking 1 Each 009E3301 Engineer Directed Surveying/Staking 40.0 Hour 009E4200 Construction Schedule, Category II Lump Sum LS 110E0135 Remove Delineator 4 Each 120E0010 Unclassified Excavation 7,734 CuYd 230E0010 Placing Topsoil 1,719 CuYd 260E3030 Gravel Surfacing, Salvaged 680.0 Ton 270E0110 Salvage and Stockpile Granular Material 680.0 Ton 450E4758 18" CMP 14 Gauge, Furnish 46 Ft 450E4760 18" CMP, Install 46 Ft 450E5406 18" CMP Safety End, Furnish 2 Each 450E5407 18" CMP Safety End, Install 2 Each 634E0110 Traffic Control Signs 1802 SqFt 634E0120 Traffic Control, Miscellaneous Lump Sum LS 634E0275 Type 3 Barricade 6 Each