A. Contractor shall raise/elevate two (2) existing cleanouts to grade as shown per Attachment 2, Trench Details. B. Contractor shall remove existing sewer line. Refer to Attachment 3, As-Built. Note the gas line above the sewer line and exercise caution during excavation. C. Contractor shall excavate and remove segment(s) of damaged or deteriorated six (6) inch gravity sewer pipe, totaling approximately 330 feet, including all associated fittings, and appurtenances. Contractor shall field-verify the total pipe length prior to and during removal operations per Attachment 4, Field Photo. D. Contractor shall collect, transport, and dispose of removed materials in compliance with federal, state, and local regulations. E. Contractor shall provide steel plates to cover open trenches when unattended or as required for safety...