1. Storefront Replacement: Replace the existing storefront with a hurricane-resistant storefront system. The new installation will include impact-resistant and floodproof materials, such as watertight doors and integrated flood barriers, as detailed in the approved drawings. 2. Basement Doors: Replace three (3) basement doors with HVHZ-rated Hidro 1 doors that are 90-minute fire-rated and flood-resistant, per the project specifications. 3. Windows: Repair window fenestrations and separations throughout most of the building. Work includes resetting and resealing the windows in accordance with the signed and sealed appendix attached to the drawings (titled: Window and Door Damages). 4. Flood Barriers: Install flood barriers at nine (9) specific locations as shown on the drawings. All barrier planks must be stored as close as feasible to their designated installation points to ensure quick and efficient deployment.