General Construction Work generally consists of providing and performing temporary bypass pumping; removal of existing precast wet well lid and associated hatch and vent pipe; furnishing and installing new precast wet well lid with all required appurtenances; removal of 8-inch pipe, fittings, and appurtenances; furnishing and installing 8-inch pipe, fittings, and appurtenances; removal of 3-inch pipe, fittings, and appurtenances; furnishing and installing 3-inch pipe, fittings, and appurtenances; removal of two (2) 8-inch x 4” FL DI reducers; furnishing and installing two (2) 8-inch x 4” FL DI reducers; preparation and installation of a corrosion resistant lining system within the wet well structure; removal of two (2) submersible pumps and guide rails; furnishing and installing two (2) submersible pumps; and all associated appurtenances and fittings as indicated in the Drawings and Specifications; furnishing and installing new 48-inch manhole; furnishing and installing 8-inch PVC SDR-35; rerouting a short stretch of existing force main to connect to existing gate valve; site grading; restoration; signage; seeding; and incidentals.