The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to construct a 10-foot wide asphalt multi-use pathway along the C-8 Canal Bank from Stribling Road/Fairlane Farms to Forest Hill Boulevard, for an approximate total project length of 5,000 linear feet. The work includes, but is not limited to, clearing and grubbing, earthwork, subgrade preparation and stabilization, construction of the base course and asphalt surface, shoulder construction, tie-ins to existing facilities, and restoration of all disturbed areas. All work shall be performed in accordance with the contract documents, applicable FDOT Standard Specifications for Road and Bridge Construction, FDOT Design Standards, the FDOT Local Agency Program (LAP) requirements, and all applicable local, state, and federal regulations.