1. Single-Mode Fiber Installation (Red on Diagram) • Install twelve (12) strand single-mode fiber along the routes shown on the attached diagram. • All inter-building fiber runs shall be aerial; existing poles are already in place. • Terminate fiber inside each building’s designated network cabinet (red squares). • Fiber terminations shall utilize LC connectors into LC patch panels. • Provide fiber testing results, labeling, and complete documentation. 2. Network Cabinets (Red Squares) • Provide and install a two-post equipment rack and fiber patch panel at the Main Distribution Frame (MDF) located in the Fair Pavilion. • Provide and install dedicated 120V power to each network rack location. • Cabinets shall include appropriate cable management and space for patch panels. Install Lockable wall-mountednetwork cabinets at each designated location. 3. Ethernet Cabling for Future Cameras (Green Markers) • Install Cat6 (or better) Ethernet cabling from each green marker location back to the respective building’s network cabinet. • These are cable-only runs for future camera installations; no devices are to be installed at this time. • All Ethernet drops must be labeled, terminated, and tested. 4. Antenna Mast Installation (Blue) • Install a rooftop antenna mast on the Fair Pavilion as indicated on the diagram. • Provide five (5) Ethernet cable runs from the Fair Pavilion network cabinet to the antenna mast. • Install an outdoor-rated enclosure at the mast for termination of the five Ethernet runs. • Ensure proper weatherproofing, strain relief, and grounding in accordance with applicable codes and best practices.