Work to be performed includes improvements to 2 slopes with each slope to include: erosion controls & BMP’s installation, grubbing of the area where work is to occur, benching of the slope at no more than 5 feet vertical and horizontal distance to be sufficient to allow operation of a self-propelled vibratory compactor, placement, grading and compaction of soil fill meeting plan requirements, placement of no less than 6” of topsoil with hydroseeding, tack and mulching per specifications and installation of erosion control matting per the plans. Seeding mixture to be composed of native prairie grasses and wildflowers. All compaction requirements to be met per the plans with third party testing reports to be provided by the contractor.