• Floors, stair treads and stair landing backs are to be sanded using professional refinishing equipment • Front staircase includes 17 treads and landing backs and one landing. Rear staircase includes 18 treads and landing backs. All are to be refinished. • Plug approximately 25 holes ranging in diameter from 1/8” to 1”. • Repair one board which is rotted/damaged • Refinish all hardwood floors, stair treads, stair landing backs, stair landing with 3 coats of quality high traffic oil-based polyurethane resin in a natural satin finish. • All furniture, the toilet, and all other items will be removed by Division of Forestry employees prior to the scheduled start date. • Requesting that the project be done in two phases. Ideally, the back offices, staircase and foyer would be done first and allowed to cure. After curing, the front two offices, staircase and foyer would be completed. This is to provide access to employees on the second floor during the project. However, we are flexible in how this is scheduled and completed. • Project must be scheduled so that it is completed no more than one month from the issuance of a purchase order/contract.