Schedule I 1) 50 L.F. of Root Pruning; 2) 50 L.F. of Root Barrier Placement; 3) 169,268 S.F. of 1 1/2" Full Width Coldmilling; 4) 1,090 S.F. of PCC Sidewalk Replacement; 5) 165 S.F. PCC Cross Gutter Replacement; 6) 73 L.F. of PCC Curb and Gutter Replacement; 7) 14 Curb Ramp Reconstructions; 8) 156 L.F. of PCC Sidewalk Grinding; 9) 220 S.F. of sawcut, removal, and reconstruction of residential concrete driveway approach; 10) 455 S.F. of sawcut, removal, and reconstruction of commercial concrete driveway approach; 11) 1,600 Tons of Asphalt Rubberized Hot Mix Placement; 12) 6 Ventura County Survey Monument Adjustments; 13) 36 Water Valve Box, Cover, and Riser Removal and Replacements; 14) 12 Sewer Manhole Frame, Ring, and Cover Removal and Replacements; 15)Traffic Signing And Pavement Delineation; and 16) all appurtenant work as provided in the Proposed Schedule of Work and Prices. Schedule II 1) 10 L.F. of Root Pruning; 2) 10 L.F. of Root Barrier Placement; 3) 72,325 S.F. of 1 1/2” Full Width Coldmilling; 4) 495 S.F. of PCC Sidewalk Replacement; 5) 2 Curb Ramp Reconstructions; 6) 70 L.F. of PCC Sidewalk Grinding; 7) 700 Tons of Asphalt Rubberized Hot Mix Placement; 8) 11 Water Valve Box, Cover, and Riser Removal and Replacements; 9) 6 Sewer Manhole Frame, Ring, and Cover Removal and Replacements; 10) Traffic Signing And Pavement Delineation; and 11) all appurtenant work as provided in the Proposed Schedule of Work and Prices.