• Provide submittals as required on drawing specifications. • Obtain permit documents and issue bridge notice. • Perform mobilization/demobilization. • Set up staging areas, including: fencing and vegetation protection barriers. • Provide Maintenance of Traffic in accordance with drawing specifications. • Install environmental signage, erosion control devices and turbidity barriers. • Perform water quality monitoring. • Perform video documentation of the existing steel sheet piles before and after coating activities. • Perform utility locates to ensure no utility conflicts. • Maintain a set of as-built drawings to be delivered to the Village upon completion of the Project. • Perform demolition activities and dispose of removed material in accordance with all applicable laws. • Within the limits of work- clean and coat exposed surfaces that have an existing coating on the following: retaining walls and wing walls, pile caps, slope protection, outside face of spandrel panels, all faces of railing curbs and vehicular barriers, and outer surface of steel sheet piles. • Remove existing sidewalk concrete header and re-cast at locations shown on plan. • Remove the existing damaged section of spandrel. Install new concrete spandrel section and bracing hardware and cast concrete closure pour. • Remove veneer on spandrel section adjacent to the replaced spandrel section and replace with new veneer. • Install veneer onto new spandrel section.