1.2 SCOPE OF WORK 1. Remove the existing roofing system to the wood deck and properly dispose of all debris 2. Repair all deficiencies in wood deck and fascia to match existing 3. Mechanically fasten ½” Densdeck prime coverboard attached per approved wind uplift criteria 4. Install one ply Stressbase 80 set in GreenLock adhesive applied at a minimum 2.5 gal/100sf 5. Install one ply KEE-Stone HP set in KEE-Lock spatter spray foam adhesive applied per product wind uplift criteria and datasheets 6. All vertical flashings to receive KEE-Stone HP Non-fleeceback membrane in a two-ply application 7. All drip edge conditions to be replaced with new Solarbrite KEE clad metal 8. Termination bar to be applied on all flashings set in butyl tape and sealed with Tuff Stuff sealant 9. All curbs to meet a minimum of 6-8” height 10. All expansion joints to be replaced with KEE-Stone roofing membrane 11. The contractor is responsible for ensuring positive drainage and no ponding conditions 12. All gutters to be replaced with new 22GA Garland flat sheet in style selected by the owner from the manufacturer’s standard and designer list of colors 13. All downspouts to be replaced with new 3” min schedule 30 steel pipe primed and coated to match the gutter 14. All conduit to be properly supported on Viking C-Port supports 15. All positive attachments including all U-Anchor attachments to conduit are to be supported by sleepers per Garland sleeper detail. 16. 3’ wide path of travel to be approved by the owner with Viking KEE walkway pads leading to and around all rooftop mechanical equipment 17. Replace all non-mechanical rooftop air vents, heat stacks, breathers, and penetration flashings with new to match existing. All penetrations are to be appropriately sealed and booted per Garland-approved details 18. All exposed ducts are to be coated with Cool-Sil with Unibond reinforcement at the seams