Contractor shall provide all equipment, materials, and labor required to supply and install two (2) AquaCal Geothermal Water Source Units. Installation Services – Contractor shall: 1. Remove and dispose of existing damaged geothermal units. 2. Provide and install both geothermal units and all necessary components such as, but not limited to, pumps, valves, manifolds, controls, as well as plumbing and electrical connections. 3. Commission and test functions of both geothermal units and provide documentation of said test to department representative. D. Maintenance and Training – Contractor shall: 1. Conduct a start-up maintenance visit within 30-60 days of completion. 2. Provide maintenance schedule with checklists. 3. Provide training to pool staff on operation and maintenance. 4. Provide documentation including operational and maintenance manuals. E. Deliverables – Contractor shall: 1. Provide two (2) fully functioning geothermal pool heating systems. 2. Provide as-built drawings and documentation. 3. Provide compliance certificates and inspection documentation.