The Scope of Work noted on the construction plans entails (1) Existing tree protection barricades and tagging required (2) Clearing and Grubbing: removal of vegetation along upper portions of the bank of the existing pond (littoral plant material to remain undisturbed), with certain identified trees to remain; trees to be relocated at the northeast portion of the property associated with the construction of the new gravel access roadway and associated parking, (3) Site Demolition: removal of the existing adjustable outfall structure and appurtenances at the south end of the property, (4) Earthwork: cap the existing muck sediments along the bottom of the existing pond with off-site imported sand, (5) rework the southern perimeter bank sloping subsequent to removal of the outfall structure and construct overland spillway, (6) install pond bank sodding, (7) installation of gravel access roadway and associated parking, (8)install access roadway swales and drainage piping, (9) site preparation for chickee hut (chickee hut to be installed by others - Native American contractor), (10) ADA pathway connection to the western edge of the property, (11) install new meandering 5’ wide mulch nature trail, and (12) install erosion control BMPs during construction.