1. Mobilization: shall be lump sum, shall include but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site. 2. Remove Existing Benches: shall be by each, shall include but not limited to the removal of benches shall include furnishing all labor, tools, equipment and incidentals for removal of the items, complete in place, including fittings appurtenant to its construction and pavement repair at bench locations, as indicated on the drawings, specified in these Special Provisions and as directed by the City. 3. Remove Existing Net Posts and Nets: shall be by each, shall include full furnishing all labor, tools, equipment and incidentals for removal of compensation for removal of net posts and nets, complete in place, including removal of footings, and fittings appurtenant to its construction and pavement repair at post locations, as indicated on the drawings, specified in these Special Provisions and as directed by the City.