To provide architectural and engineering services (preliminary and final design, contract administration and site inspection) for the renovation of the Fitch High School stadium which includes the football field, running track, grand stands, new restroom/concession and storage buildings as well as other site amenities. Phase 1 – Conceptual Design General familiarize yourself with the area and special issues Hold a design kick-off meeting to gather input and ideas from the various stakeholders Perform field surveys and gather available utility information Prepare concept level plans with budgeting order of magnitude costs Identify any project components that may not be able to be completed due to project budget or other constraints Refine plans based on comments from staff Phase 2 – Preliminary Engineering / Preliminary Design Develop design plans and profiles to 30% completion stage based on the conceptual plans from Phase 1 Identify any permits needed Code analysis and ADA compliance review Preliminary lighting design and photometric analysis Identify utility relocations Include typical cross-sections, building floor plans, sidewalks, drainage and other utilities, and pertinent details