4.1 Provide and install gutters, downspouts and flashing and drain couplings. 4.2 Remove and dispose of existing gutters, downspouts, flashing and drain couplings. 4.3 Sheer off old gutters leaving 2’’ of the back to use as a drip edge, to ensure there will be no Water to run behind the new gutters. 4.4 Clean out roof drains for proper drainage. 4.5 Install expansion joints as specified in specifications. 5.0 Specifications 5.1 Gutters A. Commercial grade 8’’ seamless K stye gutter .032-gauge, heavy duty hangers installed every 2’ with expansion joints for every run over 100’ to ensure expansion and contraction does not cause the new gutter to crease and buckle. Corners should be cut with a compound miter saw to true angle of the turn for a clean and professional looking corner. Color (Bronze) 5.2 Downspouts A. Commercial Grade 4’’x 5’’ – .027 Gauge. Color (Bronze) B. PVC drain couplings (18) 6.0 CLEANING AND PROTECTION A. Protect all landscaping plants in work area. B. Clean up all work area’s work debris when completed. C. Touch-up, repair, or replace damaged finishes before Substantial Completion.