The work shall include, but not be limited to, the following: 1. Mobilize on site. 2. Install temporary protection to safeguard the building and adjacent areas. 3. Remove the existing boiler system and properly dispose of all demolition materials. 4. Patch and/or parge existing masonry surfaces as needed. 5. Install two (2) new oil-fired boilers in accordance with manufacturer specifications. 6. Install all associated plumbing, glycol, temperature gauges, expansion tanks, electrical and control wiring, and necessary piping connections for a complete system. 7. Install structural concrete, grout, and any needed masonry to support proper installation. 8. Provide and install new oil lines from each boiler to the existing exterior concrete oil tank. 9. Contractor shall obtain all required permits and shall be responsible for all associated fees. 10. Start-up, testing, balancing, and verification of full system operation. 11. Provide owner training and all warranty documentation at project closeout.