Potential tasks include, but are not limited to: • Design and permitting of water distribution, gravity sanitary sewer, and pressurized sanitary systems to include extensions of infrastructure into existing neighborhoods. • Design or design review of sewer pump stations with manifolded force mains, including low pressure collection systems. • Water or sewer hydraulic modeling necessary to support design and permit applications. • Construction administration and construction observation (CA/CO) will be utilized for CFPUA designed projects as well as designs by the selected engineering firm for water and sewer projects. CA/CO services shall consist of field observation, coordination, preliminary submittal review, preliminary pay request review, etc. The construction observer will report directly to the engineer of record.