This HCAI 1 project consists of remodeling and construction activities on the basement level of Davis Tower within the main hospital at UC Davis Medical Center. The work is organized into multiple stages to ensure phased execution and compliance with project requirements. The work of this contract is divided into two (2) Phases. Phase 1 must be completed prior to the start of Phase 2. Stage Breakdown • Make Ready – Phase 1: Preparatory work in basement areas to support Phase 1 remodel activities. 0711C Assist Client Move, 0711C Kit Check/Packaging Equipment Move • Phase 1: Demo and build-out of Non-sterile Compounding Room [0711A], relocate [0762G] Pedi-Pod Staff to Remodeled [0711A] Non-Sterile Compounding, Demo and build out Bulk Storage [0766B], Kit Check [0777], and Receiving Area [0776]. • Make Ready – Phase 2: Additional preparation in basement areas for Phase 2 remodel. Demo Pedi-Pod [0762G] in phases to maintain continuous access to adjacent Narc Vault. • Phase 2: Remodel of Central Pharmacy [0762] which includes relocation of an existing Pyxis and New Carousel Install. Remodel Hallway [0715], Offices [0711C & 0715A], Multi-User Women’s Restroom [0786], and Multi-User Men’s Restroom [0784].