The scope of work includes demolition of Sanjo Street which is an existing one-way asphalt road; widening of the road to improve it for two-way traffic; installing new base and pavement section; and installing new storm drainage pipes and structures within the city right-of-way and easements as described in these contract documents and illustrated on the drawings prepared by Bowman Consulting Group. Specifically, Sanjo Street which is approximately 13’ +/- wide (width varies) will be demolished to earth subgrade which includes asphalt pavement, base materials, and any additional subgrade earth materials as required to meet the proposed elevations for the new pavement section described in these documents and as illustrated on the drawings. Contractor shall grade and widen the proposed two-way road to 26’ wide from back of curb to back of curb.