1 Pile Driver Foreperson – Straight Time (ST) 180 HR 2 Pile Driver Foreperson – Overtime (OT) 32 HR 3 Pile Driver Journeyperson - ST 320 HR 4 Pile Driver Journeyperson - OT 32 HR 5 Crane Operator - ST 160 HR 6 Crane Operator - OT 32 HR 7 Deck Engineer - ST 160 HR 8 Deck Engineer - OT 32 HR 9 Deckhand - ST 160 HR 10 Deckhand - OT 32 HR 11 Boat Captain - ST 160 HR 12 Boat Captain - OT 32 HR 13 100-ton Spud Barge Mounted Revolving Crane w/100 Ton Capacity @30-ft radius, & min. boom length 120 ft 10 Day 14 50-ton Spud Barge Mounted Revolving Crane w/50 Ton Capacity @30-ft radius, & min. boom length 100 ft 5 Day 15 Flat Deck Barge - 100' Min Length 10 Day 16 Flat Deck Barge - 150' Min Length 10 Day 17 Crawler Crane - 100 ton minimum 10 Day 18 Tug or workboat 500 HP, (without crew) 15 Day 19 Barge Mobilization (sec 01 71 13) 3 Each 20 Barge Mobilization, Lake Washington (sec 01 71 13) 1 Each