1 Remove Existing Guardrail, Posts -- Complete System Lin Ft 2 Embankment Pad for 0’ To 10’ Fill Height Lin Ft 3 Type A Turn Down Terminal Section Each 4 Remove and Replace 12.5 Foot Beam (Type A Guardrail) Each 5 Remove and Replace 12.5’ R BM, CONC/CONVEX Type A Each 6 Remove and Replace Steel Post, 6 Foot (Type A Guardrail) Each 7 Remove and Replace Wood Post, 6 Foot (Type A Guardrail) Each 8 Remove and Replace Steel Post, 9 Foot (Type A Guardrail) Each 9 Remove and Replace Wood Post, 9 Foot (Type A Guardrail) Each 10 Remove and Replace Wood Block 8”x 6”x 14” (Type A Guardrail) Each 11 Remove and Replace End Section (Shoe) (Type A Guardrail) Each 12 Remove and Replace Terminal Connector (Type A Guardrail) Each 13 Install Post in Solid Rock or through Concrete (Type A or E Guardrail) Each 14 Realign and Use Existing Post (Type A or E Guardrail) Each 15 Remove and Replace 12.5 Foot Thrie Beam Rail (Type E Guardrail) Each