Purpose: Solicit quotes to furnish and install replacement equipment for the CL2 chemical feed system and associated electrical rework, including programming and start-up. 1) Scope of Work 1. Provide a complete CL2 system mounted on a 1/2 inch PVC mounting board, with all pertinent equipment mounted. 2. Provide two (2) Regal A-930-17A High/Low Ball Check Ejectors. 3. Provide two (2) Regal A-255 Rate Meter Assemblies (sized as necessary). 4. Provide miscellaneous Schedule 80 PVC, fittings, pressure gauges, true-union ball valves, tubing, and other appurtenances required for a complete installation. 5. Reuse existing pacing valve (by Owner) unless vendor identifies incompatibility; include any adapters needed. 6. Electrical rework inside the building including fasteners, strut, cable, PVC, wire, etc., as required for the new system integration. 7. Installation, programming, commissioning, and start-up of the above systems, including verification of proper operation and Owner walk-through/training.