The scope of the work shall include but not be limited to removal of infiltrated concrete from walls and topping slabs, treatment of exposed rebar, epoxy injection of cracked trusses, repair of damaged trusses and double tees, shoring of structural members during repairs, installation of a new concrete column, installation of carbon plate reinforcement at affected structural areas, installation of a silane sealer on the entire parking garage, installation of a traffic coating system in specified areas, repair of steel stairs, sealing of stairwell walls with elastomeric joint sealant, painting of stairwell walls, replacement of damaged fire sprinkler lines, demolition of existing CMU walls, reconstruction of topping slabs and removed concrete with repair mortar, insulation of CMU stairwells, perimeter sealing of the entire garage, electrical demolition, and plumbing demolition, floor drain replacement, application of migrating corrosion inhibitor, provide and install new clear elastomeric waterproofing coating/sealer.