The Work of the Project is defined by the Contract Documents and consists of the following: THE PROJECT INVOLVES THE BEACH ACCESS BOARDWALK AT STATION 24. APPROXIMATELY 700' OF EXISTING BOARDWALK WILL BE REMOVED AND REPLACED. AN ADDITIONAL 60' OF BOARDWALK WILL BE INSTALLED AT THE NORTH END AND AN ADDITIONAL 200' WILL BE INSTALLED AT THE SOUTH END, FOR A TOTAL NEW BOARDWALK LENGTH OF 960'. RAMPS PERPENDICULAR TO THE BOARDWALK WILL ALSO BE CONSTRUCTED AT THE FIRST INLAND DUNE AND ONE BENCH/REST AREA WILL BE CONSTRUCTED WITH THE FINAL LOCATION TBD BY THE OWNER. THE BEACH ACCESS BOARDWALK WILL BE 6' WIDE AND WILL BE CONSTRUCTED OF DIMENSIONAL LUMBER, TIMBER PILES, AND COMPOSITE DECKING. REMOVAL AND PROPER DISPOSAL OF THE EXISTING BOARDWALK IS INCLUDED IN THE WORK. THE DRAWINGS SHOWN HEREIN PREPARED BY APPLIED BUILDING SCIENCES, INC. (ABS) ARE THE STRUCTURAL PLANS. THE BASE BID SHALL CONSIST OF WEARDECK HDPE DECKING AND GUARD/BENCH COMPONENTS. THE BASE BID SHALL INCLUDE EDGE PROTECTION AT RAMPS AND RAMP LANDINGS (5' BEYOND THE END OF RAMPS) ONLY.