Asbestos Removal: Asbestos containing materials were detected in multiple locations in all three (3) buildings. (See attached ACM survey.) The Contractor shall remove and dispose of the asbestos containing material according to all local, State and Federal regulations. The asbestos removal may be sub-contracted by the demolition contractor; however, this work must be conducted only by a TDSHS licensed asbestos abatement contractor. Demolition: - The three (3) structures shall be demolished down to dirt, all sidewalks, concrete flatwork, concrete piers shall be removed and disposed of. All water and sewer connections shall be cut off below grade. - The Contractor shall remove and dispose of all existing debris/trash/tires, etc. on the property. - The contractor shall remove the existing CMU retaining wall and trees along the south property line. The chain link fence shall be protected and remain in place. - The contractor shall locate the existing sewer line from the residences, cut and cap. - **The two (2) mature large trees along Emmanuel Street shall remain in place. The Contractor shall protect the two (2) trees while performing demolition work.