• Perform slope stabilization for approximately 13,500 square feet of affected area. • Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. • Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. • Provide a global stability analysis and calculations stamped by a Georgia Licensed Professional Engineer, ensuring a minimum factor of safety of 1.3. • Construct stabilization improvements in accordance with approved design, applicable standards, and best practices. • Extend the existing retaining wall approximately 40 feet to the west below the tanks (refer to Scope of Work sketch). • Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment. • Provide a minimum five (5) year warranty covering both design and construction, including any failure, movement, or