The City of Tamarac is hereby requesting bids, from qualified contractors, for the construction of the Citywide Culvert Headwall Improvement Project - Phase VII (ITB No. 26-04B). The proposed project sites (3 locations) include the following: Location No. 1 – NW 70th Avenue, north of NW 80th Court; Location No. 2 – NW 79th Avenue, south of NW 60th Street (East and West Side); and Location No. 3 – Westwood Drive, north of NW 74th Court (East Side). Refer to Exhibits 1-3, Location Maps for the referenced locations. The work shall include, but not be limited to, demolition of existing headwalls, the construction of new aluminum sheet piling headwall and/or riprap installation, improvements to existingdrainage system, asphaltic concrete pavement restoration, striping, concrete sidewalk and curb replacement, guardrail restoration, earthwork and landscape restoration improvements. The work to be performed consists of furnishing all labor, materials, tools, and equipment necessary to complete this project, as indicated in the Special Conditions, Special Provisions, and Technical Specifications herein and within the project design plans.