US97: Moro – Grass Valley Section of the Sherman Highway (Rt. No. US97) beginning in Moro. FAP No. SA042(026). ($ 5,000,000 - $ 10,000,000). Req. approx. 510 ft2 temp sign; 2 ea PCMS; 1,920 hr flag; 2 ea flag sta light; 80 ea TCS; 960 hr pilot car; 2 ea AFAD; 132 ft temp rumb strip; 2,400 ft stripe rem; 34 ea check dam; 450 ft sed barr; const surv work; 690 yd2 rem surf; 3,975 ft sawcut; 418 ft pipe; br rem work; 125 yd2 br deck CPPR; 1,197 ft2 waterprf membrane; 2 ea br id marker; 114,970 yd2 CPPR; 3,700 ton aggr base; 53 ton tack coat; 23,024 ton ACP (1,301 ton PG64-28); 2 ea core corr; 1,500 yd2 ACP repair; 39 ea asph appr; 3,213 ft gr rl; 9,038 ft adj gr rl; 9 mi rumb strip; 138,000 ft pvmt marking durable; 216 lb sign supp; 0.5 acre seed. Completion Time: October 30, 2026. Class of Work: Asphalt Concrete Paving and Oiling. This project contains asphalt and fuel escalation clauses