Successful bidder shall provide all labor, tools, and materials necessary to install new 24-strand fiber optic cable(s) from the CCC Main Crossconnect (MC) located in Building AC1, Room 133T to the entrance telecom room (TR) of each CCC building as per design drawings and specifications. 1. The new fiber optic cable(s) shall be installed in parallel with the existing legacy fiber optic infrastructure, ensuring no disruption to current services. 2. Utilize existing pathways for cable routing wherever feasible to minimize construction impact and maintain compliance with building standards. 3. All work shall comply with applicable industry standards, local codes, and CCC specifications for fiber optic installation. 4. Contractor shall provide testing and certification of all installed fiber optic cables to verify performance and connectivity.