SCOPE OF PROJECT: The following recommendations and scope of work items were identified; however, it should be noted that this summary may not be the complete representation of the work which will be required to implement the general intent of the work. The work includes but is not limited to: 1. Interior floor to ceiling Partitions to define new break-out spaces and small meeting rooms. 2. Modifications to systems including lighting, mechanical, fire protection and fire alarm resulting from layout changes. 3. New electrical and tele/data to support program of the room. 4. Durable finishes; 5. New doors and hardware; The work includes all reports, drawings, specifications, and cost estimates required to bid the work. A base project which meets the budget is expected. Due to budgetary constraints, alternates may be required for the project and are included in the work. The design team shall coordinate with the Owner/Owner’s OPM to establish a full and updated project budget. However, if there are reasons and benefits to segregating the overall work scope into separate construction contracts, with potentially different contractors for technical or logistical reasons, then the Consultant should be prepared to address these options with the client working group during the Study Phase.