The purpose of this project is to modernize one (1) in-ground hydraulic freight elevator in the Foster Building to a dual use Freight/Passenger Elevator. The upgrade will ensure the elevator meet all Kentucky Building Code (KBC) and ASME A17.1-2010 elevator requirements. The work will involve the installation of new equipment, as specified, while reusing and modifying existing components where applicable. The following is included in the scope of work: - All required materials. - Demolition of existing systems as necessary. - Labor for installation and modifications. - Applicable taxes, freight, and permits. - System adjustments and testing. - A 12-month warranty on all installed equipment and components. The following tasks required by code will be provided by the contractor and included in the price: 1. Electrical, fire alarm, and sprinkler upgrades or changes. 2. HVAC requirements for the existing machine room, including sump pump installation and cover. 3. Removal and replacement of existing flooring and installation of new flooring as selected by the University. 4. Any additional requirements as stipulated by the elevator inspector or local authorities a. New Elevator Cab Interiors: 1. New Kingswood Walnut wall panels, with black inlay in between, over the existing side and back walls of the cab shell. 2. New #4 brushed stainless steel handrails on the side and back walls. 3. New 14 gauge #4 brushed stainless steel opening wall. 4. New island down light ceiling with six (6) #4 brushed stainless steel panels and a solo beam led light in each panel. 5. New #4 brushed stainless steel center parting car doors. 6. New extruded aluminum car door sill. 7. New flooring shall be Mohawk Group Large and Local Wood C0128 LVT Woody 978