This project concludes the Town of Malden’s muti-phased water system improvements. This phase of the project consists of supplying and installing a well pump and associated piping for Well 03 which was drilled in 2023; constructing a CMU block wellhouse; providing power, communications, and controls for Well 03; upgrading the communications and controls for the existing Well 02; furnishing and installing an emergency generator for Well 03; and installing 6” water transmission main to connect the well to the transmission main installed in 2022; and completing surface restoration (gravel and hydroseed). Bid Additive 1 consists of construction of approximately 2,600 linear feet of 8-inch water main, 3 fire hydrants, 1 sampling station, 1 pressure reducing valve station, and completing surface restoration (gravel and hydroseed). Bid Additive 2 consists of construction of approximately 740 linear feet of 8-inch water main, 1 fire hydrant, and 1 pressure reducing valve station, and completing surface restoration (gravel and hydroseed).