The following is a general description of the work to be done under this Contract. This list is intended to give the Contractor a general description of the work involved in this Contract and is not a complete listing of all work to be done. All work shall be done in accordance with the Contract Documents even though not specifically mentioned in this list. 1. Prepare the roadway for shifting traffic, including shoulders, as indicated on the plans. 2. Install and maintain the required stormwater pollution prevention and erosion control measures. 3. Clear, grub, and trim trees within the project site as shown in the contract plans. 4. Perform full depth pavement repairs as indicated on the contract plans and as directed by the Project Engineer. 5. Mill and inlay travel lanes and shoulders, MP NE 8.8 – MP NE 10.8 Southbound. 6. Alter drainage structures to new top elevation of the proposed asphalt overlay and perform all frame and grate work. 7. Clean and fill pavement cracks and joints, repair spalled pavement areas within the proposed asphalt overlay limits, MP NE 10.8 – MP NE 13.0 Northbound and Southbound. 8. Install 3.5” asphalt overlay as shown in the contract plans. 9. Install precast concrete pavement slabs at locations shown in the contract plans. 10. Construct overhead cantilever sign structures at MP NE 10.9 NB and MP NE 11.3 NB. 11. Perform guide rail and concrete barrier work at locations shown in the contract plans. 12. Install new pavement markings. 13. Install mile markers, tenth mile markers, delineators, and snowplow markers. 14. Place topsoil and establish turf. 15. Maintain work zone traffic control at all times as required by the contract documents and as directed by the Engineer.