Project consists of the rehabilitation of the Shunga Pump Station, rehabilitation of the biofilter that serves the station, installation 6,168 linear feet of 20-inch force main by trench excavation, installation of 1,016 linear feet of 10-inch force main by horizontal directional drilling, slipline, 6,165 linear feet of existing 42-inch DIP force main with new 36-inch pipe, installation 996 linear feet of 36-inch force main by trench excavation, rehabilitation of 907 linear feet of 30-inch gravity main, rehabilitation 206 linear feet of 27-inch gravity main, rehabilitation of 13 existing manholes, abandonment of 1 existing manhole, rehabilitation of 5 sanitary sewer structures, removal and replacement of 3,934 square yards of concrete pavement, and the removal and replacement of 1,423 linear feet of Type II curb and gutter, and the installation of approximately 3,770 square feet of new sidewalk and appurtenant work.