Project Site 1 is located on Spartan Way, between Stanford Crossing and Golden Valley Parkway and Project Site 2 is located at the intersection of Barbara Terry Boulvevard and Adobe Way. The work to be performed under this contract is generally described as, but not necessarily limited to a 3” grind of asphalt paving, minor demolition of concrete curb and landscape, installation of 2” conduit, construction of two concrete raised crosswalks with #4 reinforcement, installation of four City furnished 14’ type 1-B poles, and Safe-T Lane Interlocking Concrete Bike Lane Dividers with long and tapered end units at Site 1, installation of striping, pavement markings, ADA ramps, and landings at both Project Sites, and all appurtenant work in place and ready for use, all shown in the Contract Plans and Specifications.